Amount of uncertainty – Higher the uncertainty, shorter should be the iteration length to tackle the uncertain scenario.
How Long Priorities Can Remain Unchanged – If the priorities for the stories are changing within an iteration then it is a fair indication that the iteration length needs to be shortened.
The Overhead of Iterating – If the project needs a ‘manual’ regression suite to be executed at the end of each iteration then shorter iterations could be more expensive.
How Soon a Feeling of Urgency Is Established – If the iteration lengths are too long then the team tends to become complacent through the early phase of the iteration and gets into a crunch mode towards the end. The key is to decide on a length which encourages the team to work at a consistent pace.
Extract - Ideal Iteration Length
2009.04.30. 08:25 takacsot
Szólj hozzá!
A bejegyzés trackback címe:
https://takacsot.blog.hu/api/trackback/id/tr751045271
Kommentek:
A hozzászólások a vonatkozó jogszabályok értelmében felhasználói tartalomnak minősülnek, értük a szolgáltatás technikai üzemeltetője semmilyen felelősséget nem vállal, azokat nem ellenőrzi. Kifogás esetén forduljon a blog szerkesztőjéhez. Részletek a Felhasználási feltételekben és az adatvédelmi tájékoztatóban.
Nincsenek hozzászólások.